AUSTRALIAN SUPERYACHTS | CASE STUDY
Built for Charter
Ghost II and Oneworld: the first Gulf Craft superyachts built new for high-capacity Australian charter
Facts
| Yachts | M/Y Ghost II, Majesty 122 (about 37 m), delivered 2016; M/Y Oneworld, Majesty 100 (about 30 m), delivered 2018 |
|---|---|
| Builder | Gulf Craft, United Arab Emirates |
| Standards | RINA commercial class, MCA Large Yacht Code, Australian commercial survey for offshore operation and high-capacity harbour charter |
| Survey achieved | Oneworld: 105 passengers. Ghost II: high-capacity harbour charter on Sydney Harbour |
| Our role | Australian dealer and technical compliance lead, from specification to Australian survey |
| Period | 2014 to 2018, during the transfer of commercial vessel survey from NSW Maritime and the other states to AMSA |
The problems we solved
Building to a set of rules that was itself changing
The problem: Both yachts were built during the transitional period when responsibility for commercial vessel survey was passing from NSW Maritime and the other state authorities to AMSA as the single national regulator. The rules, the paperwork and even the question of which authority would sign off were moving while the yachts were on the slipway.
What we did: We wrote the Australian requirements into the specification from the start, and worked with the state authority, AMSA, the classification society and the flag state to agree a single route to certification that all of them would accept.
The result: One set of drawings and one build programme satisfied class, flag and the Australian regulator, for both yachts.
A yard building its first commercial superyachts
The problem: A builder used to private yachts works from private yacht drawings. Moving to commercial survey for large passenger numbers raised myriad issues across stability, structure, crew accommodation, fire protection, lifesaving equipment, electrical standards and tonnage.
What we did: Our naval architect and project team worked at the yard through the build, checking every system against the Australian requirements, finding the issues early and agreeing the fixes with the yard and the surveyors.
The result: The issues were solved in the UAE, where it was cheapest and fastest to solve them, and both yachts left the yard ready for Australian survey.
Quote
“The support with Ghost II was exceptional.”